What Is New Construction Financing and How Does It Work?

A plain-English, underwriter's breakdown of ground-up construction loans, draw schedules, and how builders and contractors actually get paid at each phase.

DN
Dinero Editorial Team
Updated Sep 1, 2026 · 6 min read

New construction financing is short-term, stage-based funding used to build a structure from the ground up, where the lender releases money in installments called "draws" as verified building milestones are completed rather than handing over the full amount at closing. Because there is no finished building to appraise or collateralize on day one, the loan is underwritten against the project's plans, budget, timeline, and the borrower's capacity to deliver. Interest is typically charged only on the money actually drawn, and most of these loans are designed to be repaid or refinanced within 12 to 24 months once the project is complete. For the contractors and builders who execute the work, the real cash-flow problem is rarely the construction loan itself, it is covering payroll, materials, and mobilization in the gap between draws, which is where revenue-based working capital becomes the practical companion tool.

Key takeaways

  • New construction financing is short-term, stage-based funding that releases money in draws as verified building milestones are completed, not as one lump sum.
  • Interest is typically charged only on the amount drawn to date, and most construction loans are repaid or refinanced within 12 to 24 months.
  • Draw schedules, interest reserves, and retainage all create a built-in gap where the contractor spends first and is reimbursed after inspection.
  • Construction-to-permanent (single-close) and stand-alone (two-close) are the two most common loan structures, chosen based on the project's exit.
  • Traditional construction loans underwrite plans, budget, equity, and credit; the process is document-heavy and slow by design.
  • Revenue-based working capital approves on bank deposits and revenue over credit, funds in 24 to 48 hours, starts around $10,000, and fits FICO 500+.
  • A construction loan builds the structure; revenue-based working capital keeps payroll and suppliers current between draws, the two are complementary, not interchangeable.

How new construction financing actually works, step by step

Unlike a mortgage on an existing property, a construction loan is a draw-against-progress instrument. The mechanics run in a predictable sequence:

  1. Underwriting the plan, not the building. The lender reviews architectural plans, a line-item construction budget, the general contractor's track record, permits, and the projected as-completed value. Approval rests on whether the numbers and the timeline are credible.
  2. Closing and the initial draw. At closing the borrower usually contributes equity (land or cash) first. The lender then funds an opening draw for mobilization, permits, and site work.
  3. Milestone draws. Money is released in tranches tied to completed phases, foundation, framing, dry-in, mechanicals, finishes. Each draw request is verified, often by a third-party inspector, before funds move.
  4. Interest-only during the build. You typically pay interest only on the balance drawn to date, which keeps early carrying costs lower while the project is producing no income.
  5. Completion and conversion. Once the structure passes final inspection and receives a certificate of occupancy, the loan is repaid from a sale or converted into permanent, longer-term financing.

The core idea to internalize: the lender's risk drops every time a milestone is verified, so their willingness to release cash is directly tied to demonstrated progress, not promises.

The building blocks: draws, interest reserves, and retainage

Three mechanisms shape the cash flow of almost every new construction loan, and misunderstanding them is where builders get squeezed.

The draw schedule is the master document. It maps each release of funds to a specific, inspectable stage of completion. If your schedule says framing pays out at 40 percent completion, you finance framing yourself until an inspector confirms you hit it. That lag is real and it is where operating cash gets thin.

The interest reserve is a pool the lender may set aside from the loan proceeds to cover interest payments during construction, since the project generates no revenue yet. It is convenient but it is not free money, it reduces the funds available for actual building and it can run dry if the timeline slips.

Retainage is a percentage (commonly around 5 to 10 percent) that the owner or lender holds back from each payment until the job is fully complete and signed off. It protects against defects and abandonment, but for a subcontractor or GC it means a meaningful slice of every invoice is deferred to the very end.

Together these three features mean that even a fully approved, well-run project routinely operates with a working-capital gap. Learn more in our complete guide to business financing.

Need capital for your business right now?

Apply with Merchant Fund Express in 60 seconds. Decisions in 2–4 hours.

Get Funded Today →Free · No impact to your credit

Types of new construction financing

"New construction financing" is an umbrella. The right structure depends on who is building and what happens at completion.

  • Construction-to-permanent (single-close). One loan funds the build and then automatically rolls into a long-term mortgage. One closing, one set of costs, popular for owner-occupied and build-to-hold projects.
  • Stand-alone construction loan (two-close). Covers only the build; you arrange separate permanent financing or a sale at the end. More flexibility, but you close, and pay closing costs, twice.
  • Commercial construction loan. For ground-up commercial or multifamily projects, underwritten heavily on projected income and the sponsor's experience.
  • Owner-builder / spec construction. For builders constructing without a committed buyer. Higher scrutiny and larger equity requirements because the exit is a future sale.
  • Renovation and hard-money bridge loans. Faster, asset-based, shorter, and more expensive, used by investors who need speed over cost.

None of these products, however, is built to solve day-to-day operating cash flow for the contractor doing the work. That is a separate financing lane covered below.

Example project: how draws and the cash-flow gap look in practice

The table below is an illustrative, for-example draw structure on a ground-up build. Figures are round numbers to show the mechanics, not a quote, and no lender guarantees any specific schedule.

PhaseMilestone verifiedShare of budget released (for example)Contractor's cash-flow reality
MobilizationPermits pulled, site prep~10%Front payroll and equipment before draw clears
FoundationSlab / footings inspected~20%Materials paid upfront; draw arrives after inspection
FramingStructure & roof dry-in~25%Largest labor push; longest gap to reimbursement
MechanicalsPlumbing, electrical, HVAC rough-in~20%Multiple subs invoicing at once
FinishesInterior complete~15%Retainage held back begins to bite
CompletionFinal inspection / CO~10% + retainage releaseFinal holdback paid last, often 30-60 days out

Read the right-hand column carefully. In every phase, the builder spends first and gets reimbursed after verification. On a busy shop running several jobs at once, those overlapping gaps are exactly what strains payroll and vendor terms, even when every project is profitable on paper.

Decision framework: when new construction financing fits, and when to reach for working capital instead

Use the tool that matches the job. A construction loan and revenue-based working capital solve different problems.

A traditional new construction loan works best when:

  • You are financing the actual cost of building a specific, permitted structure.
  • You have the equity, plans, and a completion or sale exit that a lender can underwrite.
  • Your timeline allows weeks of underwriting and third-party inspection cycles.
  • You want interest-only carry during the build and the lowest cost of capital.

Avoid leaning on the construction loan, and consider revenue-based working capital, when:

  • The gap you need to close is operating cash, payroll, materials deposits, mobilization, not the build budget itself.
  • You are waiting on a draw or on retainage and need to bridge days, not months.
  • Your credit is thin or your FICO sits in the 500s, but your bank deposits show consistent revenue.
  • You need funds in 24 to 48 hours, not after a full construction-loan underwrite.
  • You are a subcontractor or GC who never touches the construction loan directly but still has to fund the work.

The two are complementary. The construction loan builds the building; working capital keeps your crew paid and your suppliers current in the space between draws.

The recommended path for contractors: revenue-based working capital

For the builders, GCs, and subs who actually execute new construction, the fastest and most accessible funding is not another real-estate loan, it is revenue-based financing sourced through a marketplace of funders. Here is why it fits the trade:

  • Approval on deposits and revenue, not credit. Underwriting looks at your business bank statements and cash flow. Because it weighs revenue over credit score, owners with a FICO of 500+ can still qualify.
  • Speed that matches a job site. Decisions and funding commonly land in 24 to 48 hours, fast enough to cover a payroll run or a materials order while you wait on a draw.
  • Sized for real projects. Funding typically starts around $10,000 and scales with your monthly revenue.
  • Repaid from cash flow. Repayment flexes with your receipts rather than demanding a fixed lump-sum event, which suits the lumpy, milestone-driven cash flow of construction.
  • A marketplace, not a single lender. Applying once puts your file in front of multiple funders, improving the odds of a workable offer.

Nothing here is ever guaranteed, offers depend on your actual bank activity and business profile. But for closing the gap between what you spend and when you get paid, revenue-based working capital is the practical tool. See how it stacks up in our business financing guide.

Qualifying and applying: what to have ready

Whether you pursue a formal construction loan or revenue-based working capital, preparation shortens the timeline.

For a construction loan, expect to provide complete architectural plans, a detailed line-item budget, permits or proof they are in process, your contractor's license and track record, proof of equity or land ownership, and personal and business financials. Underwriting is document-heavy and slow by design.

For revenue-based working capital, the lift is far lighter, typically the last several months of business bank statements, a basic application, and proof of ownership. Because approval keys on deposit history and revenue, a lower credit score is not disqualifying, and the whole cycle can close in a day or two.

A practical move for active builders: line up a working-capital source before you need it, so a slow draw or delayed retainage never forces you to miss payroll or lose a supplier discount.

Frequently asked questions

What is the difference between a construction loan and a regular mortgage?

A mortgage funds the purchase of an existing, finished property in one lump sum secured by that asset. A construction loan funds building from the ground up and releases money in stages (draws) as verified milestones are completed, with interest charged only on what has been drawn. Construction loans are short-term and are repaid or refinanced once the project is finished.

How do construction loan draws work?

Draws are scheduled releases of loan funds tied to completed building phases, such as foundation, framing, or mechanicals. You typically pay for each phase first, then request a draw. A lender or third-party inspector verifies the work before releasing that tranche. This creates a built-in gap where the builder carries costs until reimbursement clears.

What is retainage and why does it matter for cash flow?

Retainage is a percentage of each payment, often 5 to 10 percent, that the owner or lender holds back until the entire job is complete and signed off. It protects against defects and abandonment, but it means a meaningful portion of every invoice is deferred to the very end of the project, which can strain a contractor's operating cash even on profitable work.

Can I get construction-related financing with a low credit score?

Traditional construction loans lean heavily on credit, equity, and documentation. Revenue-based working capital is different: it is underwritten primarily on your business bank deposits and revenue, so owners with a FICO around 500 or higher can often qualify. It is the more accessible route for contractors who need to fund the work rather than the building budget itself.

How fast can a contractor get working capital between draws?

Through a revenue-based marketplace, decisions and funding commonly land in 24 to 48 hours because underwriting focuses on recent bank statements rather than a full real-estate underwrite. That speed is what makes it practical for covering a payroll run or materials order while you wait on a construction draw or delayed retainage.

How much working capital can a construction business qualify for?

Amounts are sized to your revenue and typically start around $10,000, scaling up with consistent monthly deposits. The exact offer depends on your actual bank activity and business profile, and no amount is ever guaranteed, but revenue-based funding is designed to flex with the size and cash flow of your operation.

Does revenue-based financing replace a construction loan?

No, they solve different problems and often work together. A construction loan finances the cost of building a specific permitted structure. Revenue-based working capital covers day-to-day operating cash, payroll, materials, and mobilization, in the gap between draws. Builders frequently use the construction loan for the project and working capital to keep the business running while draws clear.

How is repayment handled on revenue-based working capital?

Repayment is structured around your business cash flow rather than a single fixed lump-sum event, which suits the lumpy, milestone-driven income of construction. Because it moves with your receipts, it tends to align better with a contractor's real cash cycle than a rigid payment tied to a completion date.

Recommended partner
Fast business funding for U.S. business owners.
  • $5,000 – $5,000,000
  • Decisions in 2–4 hours
  • FICO 500+
  • No collateral on most files

Merchant Fund Express works with a network of funders to match you with the option that fits your business. Approval is based on your sales and deposits, not just your credit — and no tax returns for amounts under $250K.

ESTIMATE

See How Much Capital You Qualify For

Move the sliders for an instant estimate.

Estimated funding range
$25K – $75K
Funded in 24 hours · No collateral · FICO 500+
See My Offer →
Actual offers are based on a full bank statement review. No impact to your credit.
Apply Now
Ready to fund your business?Apply Now →